Question 1171012
.
The weight of a cement truck on its way to a construction site is given by W= 1200 +50m, where W is 
the combined weight of the truck and its contents in Ibs and m is the weight of each cubic metre of cement.

The truck must pass over a bridge  with a maximum weight of 10, 000Ibs.
To be cost effective, the truck needs to carry at least 100m^3 per trip

Determine the possible values for W and m in this situation.
~~~~~~~~~~~~~~



Excuse me,


as the problem is worded, printed, posted and presented, it is NONSENSICAL.



I do not solve problems,  formulated in nonsensical way,  in principle.



Also,  I do not want to explain,  WHY  it is nonsensical.



It is not my job or my duty at this forum.



In opposite,  it is the job and the responsibility of a visitor to provide a correct input.