Question 1161758
the half-interval is z(0.95)*sigma/sqrt(n)=1.645*2.80/7=0.658
this is added to and subtracted from the mean for the interval
90%CI is ($22.79, $24.11)

The point estimate is the means of the sample or $23.45. It is the only estimate available.