Question 105820
C(.6)=1.5*.6/(100-.6)
C(.6)=.9/99.4
C(.6)=.009 MILLION IS THE COST.
OR
C(.6)=1.5*.6/(100-60) 
C(.6)=.9/.4
C(.6)=2.25 MILLION IS THE COST.