Question 1134683
When you calculate the expected value, you have to subtract the cost ($7). 

{{{(1/800)*2993+(2/800)*493+(13/800)*3+(784/800)*(-7)=3.74+1.23+0.05-6.86=highlight(-1.84)}}}