Question 1044388
The point estimate is 0.65*450=292.5
The standard error is sqrt {(p)(1-p)/n}
sqrt {0.65*0.35/450)}=sqrt(102.3750)=10.12
z=(290-292.5)/10.12=-0.247
Want P (z>-0.247)=0.5975