Question 877553
Fred can do 1/4 the job in 1 hr.
Bill can do 1/2 the job in 1 hr.
1/2 + 1/4
=2/4 + 1/4
=3/4 the job in 1 hr together.
.
4/3 hr is the time it takes to do the job.
.
Ed