Question 822541
---
r = jobs/(worker*time)
r = j/wt
---
r = j/wt = 1/(24*30)
---
r = 1/6t = 1/(24*30)
1/6t = 1/(24*30)
1/6 = t/(24*30)
t = (24*30)(1/6)
t = 120
---
answer:
6 men require 120 days to complete the job
---
Solve and graph linear equations:
https://sooeet.com/math/linear-equation-solver.php
---
Solve quadratic equations, quadratic formula:
https://sooeet.com/math/quadratic-formula-solver.php
---
Solve systems of linear equations up to 6-equations 6-variables:
https://sooeet.com/math/system-of-linear-equations-solver.php