Question 821731
---
NOTE TO STUDENT:
rate = (one job) / (time required to do the job)
rate = job / time
r = j / t
for this problem, the job is to fill the pool
---
individual pipe rates:
r = 1/6
r = 1/9
---
the rates of both pipes filling the pool together:
r = 1/6 + 1/9
r = 9/(6*9) + 6/(6*9)
r = 9/54 + 6/54
r = 15/54
---
time per job is 1/r:
1/r = 1/(15/54)
1/r = 54/15
---
answer:
1/r = 3.6 hours to fill the pool
---
Solve and graph linear equations:
https://sooeet.com/math/linear-equation-solver.php
---
Solve quadratic equations, quadratic formula:
https://sooeet.com/math/quadratic-formula-solver.php
---
Solve systems of linear equations up to 6-equations 6-variables:
https://sooeet.com/math/system-of-linear-equations-solver.php