Question 393524
Computer A can do a job in 4 hours. Computer B can do the same job in 2 hours. How long will it take them to complete the job working together?
-------------
A rate = 1/4 job/hr
B rate = 1/2 job/hr
---
Together rate: 1/x job/hr
-----------------------------
Equation:
rate + rate = together rate
1/4 + 1/2 = 1/x
---
Multiply thru by 4x to get:
x + 2x = 4
3x = 4
x = 4/3 = 1hr and 20 min (time to do the job together)
====================
Cheers,
Stan H.
===============