Question 321410
1.A silversmith has two alloys, one containing 30% silver and the other, 55%.
 How much of each should be melted and combined to obtain 100 grams containing 45% silver?
:
Let x = amt of 55% alloy
Total amt will be 100 gr, therefore
(100-x) = amt of 30% alloy required
A typical mixture equation, using decimals
.55x + .30(100-x) = .45(100)
.55x + 30 - .30x = 45
.55x - .30x = 45 - 30
.25x = 15
x = {{{15/.25}}}
x = 60 gr of 55% alloy
then
100 - 60 = 40 gr of 30% alloy
:
:
2) A cellular phone company charges customers a certain amount for the first
 minute of a long distance call and an additional amount for each succeeding  minute.
 A customer makes two calls to the same city, a 33-minute call for Php 269
 and a 19-minute for Php 157. 
How much does the cellular phone company charge for the first minute? for each succeeding minute?
:
Let x = amt charged for 1st min
Let y = amt charged for each succeeding min
:
Call 1: x + 32y = 269
Call 2: x + 18y = 157
-----------------------Subtraction eliminates x, find y
"     "0x + 14y = 112
y = {{{112/14}}}
y = 8 cents for each succeeding min
I'll let you find the value of x, the first minute cost
:
:
3) A swimming pool can be filled by three water pipes, A,B and C.
 Pipe C alone can fill the pool in 8 hours. 
If pipes B and C are used together, the pool can be filled in 6 hours.
 If pipes A and B are used together, it takes 10 hours.
 How long does it take to fill the pool if all three pipes are used?
:
Let the completed job = 1 (a full pool)
:
"pipes B and C are used together, the pool can be filled in 6 hours."
{{{6/B}}} + {{{6/C}}} = 1
It tells us pipe C can do it in 8 hrs, therefore:
{{{6/B}}} + {{{6/8}}} = 1
multiply by 8B
8(6) + 6B = 8B
48 = 8B - 6B
48 = 2B
B = {{{48/2}}}
B = 24 hrs for B alone
:
"If pipes A and B are used together, it takes 10 hours." we know B, therefore
{{{10/A}}} + {{{10/24}}} = 1
Multiply by 24A
24(10) + 10A = 24A
:
240 = 24A - 10A
240 = 14A
A = {{{240/14}}}
A = 17.143 hrs for A alone
:
: