Question 191435
A plumber can install a dishwasher in 50 minutes. If the plumber brings his apprentice to help, the job takes 40 minutes. How long would it take the apprentice working alone to install the dishwasher?
---------------------
Plumber DATA:
time = 50 minutes/job ; rate = 1/50 job/min
------
Together DATA:
time = 40 minutes/job ; rate = 1/40 job/min
------------
Apprentice DATA:
time = x min/job ; rate = 1/x job/min
----------------------------------------------------------
Equation:
rate + rate = together rate
1/50 + 1/x = 1/40
Multiply thru by 200x to get:
4x + 200 = 5x
x = 200 minutes (time the apprentice would need to do the job alone)
-----------
Cheers,
Stan H.