If they continue to outsource the item, their total cost will be 5,000 X $20.


If they make the switches themselves, then it will cost:


$3 + $2 + $1 = $6 per switch times 5000 switches PLUS


$25,000 batch set-up PLUS


$37,500 salaries PLUS


$20,000 factory cost PLUS


$1,500 times 12 months lost lease revenue.