Question 148046
Johnny can do 1/4 the job in 1 hr.
Rebbecca can do 1/3 the job in 1 hr.
1/4 + 1/3 
=(3+4)/12
=7/12 of the job in 1 hr together.
12/7 hr. Time it takes both of them to do the job.
.
Ed