SOLUTION: A group of students volunteered to finish a construction work in 25 days. 1Q of the students did not come and the work could be finished in 35 days. The original number of students
Question 995668: A group of students volunteered to finish a construction work in 25 days. 1Q of the students did not come and the work could be finished in 35 days. The original number of students in the group were?
EXPECTED:
p students to do 1 job in 25 days.
Let r be the rate for 1 student. , the work rate equation for p students.
FEWER STUDENTS:
Now, p-Q students came to do the job and time required was 35 days. .
The system of these two equations can be solved for p. See the THREE unknown variables, p, r, and Q. You might assume that either r or Q would be a constant.
Multiply by ; , original number of students expected.