SOLUTION: if 1 tractor ploughs a field in 5.6 hours and another can plough the same field in 2.8 hours. How long would it take if both were working simultaneously to plough the field
Algebra ->
Rate-of-work-word-problems
-> SOLUTION: if 1 tractor ploughs a field in 5.6 hours and another can plough the same field in 2.8 hours. How long would it take if both were working simultaneously to plough the field
Log On
Question 980744: if 1 tractor ploughs a field in 5.6 hours and another can plough the same field in 2.8 hours. How long would it take if both were working simultaneously to plough the field Found 2 solutions by Alan3354, macston:Answer by Alan3354(69443) (Show Source):
You can put this solution on YOUR website! if 1 tractor ploughs a field in 5.6 hours and another can plough the same field in 2.8 hours. How long would it take if both were working simultaneously to plough the field
-------------
2.8 is 1/2 of 5.6, equivalent to 2 tractors that take 5.6 hours.
--> 5.6/3 hours together.
You can put this solution on YOUR website! .
Tractor 1: (1 field)/(5.6hrs)=0.179 field/hr
Tractor 2: (1 field)/(2.8hrs)=0.357 field/hr
Together: 0.179 field/hr+0.357 field/hr=0.536 field/hr
.
To plow 1 field at 0.536 field/hr:
(1 field)/(0.536 field/hr)=1.87 hours