|
Question 801266: an empty tank can be filled with water in 20 mins using Pipe A or in 30 mins by Pipe B and the tank filled with water can be emptied of water in 40 mins by using Pipe C. When the three pipes A,B and c work together, approximately how long (in minutes) does it take to fill the empty tank with water?
Answer by mananth(16946) (Show Source):
You can put this solution on YOUR website! an empty tank can be filled with water in 20 mins using Pipe A or in 30 mins by Pipe B and the tank filled with water can be emptied of water in 40 mins by using Pipe C. When the three pipes A,B and c work together, approximately how long (in minutes) does it take to fill the empty tank with water?
let us consider tank filling or emptying as one job
Pipe A does 1/20 of the job in 1 minute
Pipe B does 1/30 of the job in 1 minute
Pipe C does 1/40 of the job in 1 minute
Pipe C is emptying
1/20 +1/30 -1/40 is the job done in 1 minute
7/120 of the job is done in 1 minute
120/7 minutes is taken to do 1 job
17.14 minutes
|
|
|
| |