|  | 
| 
 
 
| Question 801266:  an empty tank can be filled with water in 20 mins using Pipe A or in 30 mins by Pipe B and the tank filled with water can be emptied of water in 40 mins by using Pipe C. When the three pipes A,B and c work together, approximately how long (in minutes) does it take to fill the empty tank with water?
 Answer by mananth(16946)
      (Show Source): 
You can put this solution on YOUR website! an empty tank can be filled with water in 20 mins using Pipe A or in 30 mins by Pipe B and the tank filled with water can be emptied of water in 40 mins by using Pipe C. When the three pipes A,B and c work together, approximately how long (in minutes) does it take to fill the empty tank with water? let us consider tank filling or emptying as one job
 Pipe A does 1/20 of the job in 1 minute
 Pipe B does 1/30 of the job in 1 minute
 Pipe C does 1/40 of the job in 1 minute
 Pipe C is emptying
 1/20 +1/30 -1/40 is the job done in 1 minute
 7/120 of the job is done in 1 minute
 120/7 minutes is taken to do 1 job
 17.14 minutes
 | 
  
 | 
 |  |  |