SOLUTION: Machine A can produce 40 bolts per minute whereas Machine B can produce only 30 per minute. Machine A begins alone to make bolts but it breaks down after 1 1/2 minutes and Machine
Algebra ->
Rate-of-work-word-problems
-> SOLUTION: Machine A can produce 40 bolts per minute whereas Machine B can produce only 30 per minute. Machine A begins alone to make bolts but it breaks down after 1 1/2 minutes and Machine
Log On
Question 768206: Machine A can produce 40 bolts per minute whereas Machine B can produce only 30 per minute. Machine A begins alone to make bolts but it breaks down after 1 1/2 minutes and Machine B must complete the job. If the job requires 300 bolts how long does the whole operation take?
A) 7 1/2 minutes
B) 8 minutes
C) 8 1/2 minutes
D) 9 minutes
E) 9 1/2 minutes Answer by josmiceli(19441) (Show Source):
You can put this solution on YOUR website! In min, machine A produces bolts
-------------
Now, machine B must produce bolts
-------------
For machine B,
( number of bolts produced ) = ( rate of producing )*( time spent producing )
Let = B's time in mins min
------------
The total time to produce 300 bolts is: min