Question 736289: two machines are used to stamp metal parts in a factory. one requires 8 hours to stamp the needed parts, the other requires 6 hours. how long would it take both working together. Answer by solver91311(24713) (Show Source):
If A can do a job in x time periods, then A can do of the job in 1 time period. Likewise, if B can do the same job in y time periods, then B can do of the job in 1 time period.
So, working together, they can do
of the job in 1 time period.
Therefore, they can do the whole job in:
time periods.