You can
put this solution on YOUR website! Train A leaves a station traveling at 25 mph. One half hour later Train B leaves the same station traveling the same direction at 35 mph. How does it take for Train B to catch up to Train A?
Without algebra (in your head):
When B starts, A is 12.5 miles down the track (half of 25). B's catch-up
rate is 35-25 or 10 mph. In 1 hour B has caught up 10 of the 12.5 miles.
The remaining 2.5 miles is one quarter of 10 miles, so he'll need another
quarter of an hour or 15 minutes. Answer: 1 hour 15 minutes.
With algebra:
Let t = train A's time. Train A's time is .5 hour more
than train B's time, or t+.5
rate × time = distance
---------------------------------
Train A 25 × t+.5 = 25(t+.5)
---------------------------------
Train B 35 × t = 35t
Set the distances equal:
25(t+.5) = 35t
25t+12.5 = 35t
12.5 = 10t
= t
1.25 = t
1 hour and a quarter or 1 hour and 15 minutes.
Edwin