SOLUTION: Together, Larry and Mo require 4hrs 48min to pave a driveway. Alone, Larry would require 4hrs more than Mo. How long would it take Mo to do the job alone? Hint: convert minutes to
Algebra ->
Rate-of-work-word-problems
-> SOLUTION: Together, Larry and Mo require 4hrs 48min to pave a driveway. Alone, Larry would require 4hrs more than Mo. How long would it take Mo to do the job alone? Hint: convert minutes to
Log On
Question 415329: Together, Larry and Mo require 4hrs 48min to pave a driveway. Alone, Larry would require 4hrs more than Mo. How long would it take Mo to do the job alone? Hint: convert minutes to hours.
This is what I have so far:
Larry's time is x+4 and Mo's time is x so the time that it would take them to pave the driveway together would be expressed by: then multiply each side by the opposite demominator, making the problem: Then multiply each denominator by the opposite numerator, making the problem:
I have been struggling with this problem for over an hour.
Thank you so much for your help. Answer by solver91311(24713) (Show Source):