Question 190365: # 3. Bob wants to have concrete driveway in front of his house. The driveway will measure 58 2/3 feet long and 18 1/2 feet wide; and will be 3/4 foot thick. How many cubic yards of cement will be needed for the driveway? Round your answer to the nearest cubic yard. [1 cubic yd = 27 cubic feet]
You can put this solution on YOUR website! # 3
Q: Bob wants to have concrete driveway in front of his house. The driveway will measure 58 2/3 feet long and 18 1/2 feet wide; and will be 3/4 foot thick. How many cubic yards of cement will be needed for the driveway? Round your answer to the nearest cubic yard. [1 cubic yd = 27 cubic feet]
A:
First, we need to convert all of the mixed fractions to improper fractions.
So let's convert into an improper fraction
Start with the first fraction
Break up the mixed fraction into a sum of the whole part and the fraction part.
Multiply 58 by (to get equal denominators)
Multiply
Add the fractions
Combine like terms.
So
-----------------------------
Now let's convert into an improper fraction
Start with the second fraction
Break up the mixed fraction into a sum of the whole part and the fraction part.
Multiply 18 by (to get equal denominators)
Multiply
Add the fractions
Add
So
So the length and width as improper fractions are and . In other words, and
Now remember, the volume of a rectangular block is
where L is the length, W is the width, and H is the height
Plug in , and
Combine the fractions (note: just multiply the corresponding numerators and denominators)
Factor into
Cancel out the common terms.
Simplify
Multiply
So the volume of the concrete driveway is 814 cubic feet.
Now since we're given the equation
1 cubic yard = 27 cubic feet
we can multiply the figure 814 cubic feet by the fraction
So...
Now round to the nearest whole number to get 30 cubic yards
So Bob will need 30 cubic yards of cement to build the driveway.