SOLUTION: Two types of electromechanical carburetors are being assembled and tested. Each of the first type requires 17 minutes of assembly time and 9 minutes of testing time. Each of the se
Algebra ->
Customizable Word Problem Solvers
-> Numbers
-> SOLUTION: Two types of electromechanical carburetors are being assembled and tested. Each of the first type requires 17 minutes of assembly time and 9 minutes of testing time. Each of the se
Log On
Question 1147533: Two types of electromechanical carburetors are being assembled and tested. Each of the first type requires 17 minutes of assembly time and 9 minutes of testing time. Each of the second type requires 13 minutes of assembly time and 8 minutes of testing time. If 324 minutes of assembly time and 175 minutes of testing time are available, how many of the second type can be assembled and tested if all the time is used?Express your answer correct to three significant digits and do not include units in your answer. Answer by Theo(13342) (Show Source):