SOLUTION: A concrete driveway measures 18 yards by 4 yards. The driveway will be 0.5 yards thick. (a) How many cubic yards of concrete will be needed? (b) How much will it cost if concrete i

Algebra ->  Exponents -> SOLUTION: A concrete driveway measures 18 yards by 4 yards. The driveway will be 0.5 yards thick. (a) How many cubic yards of concrete will be needed? (b) How much will it cost if concrete i      Log On


   



Question 112300: A concrete driveway measures 18 yards by 4 yards. The driveway will be 0.5 yards thick. (a) How many cubic yards of concrete will be needed? (b) How much will it cost if concrete is $3.50 per cubic yard?
Answer by checkley71(8403) About Me  (Show Source):
You can put this solution on YOUR website!
18*4*.5=36 YDS^3 IS THE AMOUNT OF CONCRETE NEEDED.
36*3.5=$126 FOR THE COST.