SOLUTION: hello i really need help, this is the problem: In 2 ​minutes, a conveyor belt moves 100 pounds of recyclable aluminum from the delivery truck to a storage area. A smaller bel

Algebra ->  Customizable Word Problem Solvers  -> Travel -> SOLUTION: hello i really need help, this is the problem: In 2 ​minutes, a conveyor belt moves 100 pounds of recyclable aluminum from the delivery truck to a storage area. A smaller bel      Log On

Ad: Over 600 Algebra Word Problems at edhelper.com


   



Question 1111746: hello i really need help, this is the problem: In 2 ​minutes, a conveyor belt moves 100 pounds of recyclable aluminum from the delivery truck to a storage area. A smaller belt moves the same quantity of cans the same distance in 9 minutes. If both belts are​ used, find how long it takes to move the cans to the storage area.
Found 2 solutions by josgarithmetic, Alan3354:
Answer by josgarithmetic(39618) About Me  (Show Source):
You can put this solution on YOUR website!
Move 100 cans is 1 job.

1%2F2%2B1%2F9, their combined rate

9%2F18%2B2%2F18

11%2F18
OR
18%2F11 HOURS per JOB

1 HOUR and 38 MINUTES

Answer by Alan3354(69443) About Me  (Show Source):
You can put this solution on YOUR website!
For parallel work, parallel flow, parallel resistors, etc.
------------
EG: 9 & 2
Use product/sum
= 18/11