SOLUTION: At a local gravel yard, a large skip loader can move a large pile of gravel in 15 minutes. A smaller skip loader can move the same pile of gravel in 2.25 hours. How many minutes wo
Algebra ->
Rational-functions
-> SOLUTION: At a local gravel yard, a large skip loader can move a large pile of gravel in 15 minutes. A smaller skip loader can move the same pile of gravel in 2.25 hours. How many minutes wo
Log On
Question 1027978: At a local gravel yard, a large skip loader can move a large pile of gravel in 15 minutes. A smaller skip loader can move the same pile of gravel in 2.25 hours. How many minutes would it take the two skip loaders working together to move the gravel pile?
(Include units with your numerical answer. Round your answer to one decimal place.)
It would take about_______for the two skip loaders working together to move the gravel pile. Answer by josgarithmetic(39620) (Show Source):