Question 170648: A concrete driveway measures 14 yards by 5 yards. The driveway will be 0.75 yards thick. A) How many cubic yards of concrete will be needed? B) How much will it cost if concrete is $4.75 per cubic yard?
Answer by Mathtut(3670) About Me  (Show Source):
You can put this solution on YOUR website!
14%285%29%28.75%29=52.5 cu yards will be needed
:
52.5%284.75%29=249.38dollars