SOLUTION: mr. Smith is building a stone wall. he estimates he will need 8 1/4 tons of stone to complete the wall. his truck can carry at most 1/2 ton of stone in each load. 1. Mr. Smith l

Algebra.Com
Question 1165045: mr. Smith is building a stone wall. he estimates he will need 8 1/4 tons of stone to complete the wall. his truck can carry at most 1/2 ton of stone in each load.
1. Mr. Smith loads his truck with 1/2 ton of stone for each except the last truck.
About how many full loads of stone will mr.smith take with his truck, and the fraction of a load of stone he need to take on the last truck?
2. How many 3/4 ton piles of stone does Mr. Smith have when he uses 6 full loads of stone for another wall

Answer by Boreal(15235)   (Show Source): You can put this solution on YOUR website!
He needs 17 truck trips
16 of them carry (1/2) ton for 8 tons.
The last load is 1/4 of a ton.
6 full loads of stone are 3 tons
3/(3/4)=3*(4/3)=4 piles of 3/4 tons of stone.

RELATED QUESTIONS

A mason is building a drystack stone wall that is 3 feet high. If each stone is 4 inches... (answered by josmiceli)
A mason is building a drystack stone wall that is 3 feet high. If each stone is 4 inches... (answered by checkley71)
Bob the bricklayer can complete a stone wall in 8 hours. Butch the bricklayer can finish... (answered by josmiceli)
Adam will use x black stone tiles and y gray stone tiles to cover his patio floor. Black... (answered by Boreal)
Adam will use x black stone tiles and y gray stone tiles to cover his patio floor. Black... (answered by ikleyn)
A large circular garden is surrounded by a stone wall that is 6 inches wide. The... (answered by ankor@dixie-net.com)
I have hit a stone wall and need help. I'm only looking to get the right answer, I want... (answered by Fombitz)
Ben wanted to know how old his friend Mr. Stone was. Mr. Stone told him, "I started... (answered by Sridi)
Ralph has seven different colors of leftover paint. Since there is not enough of any one... (answered by stanbon)