SOLUTION: Aki's bicycle designs has determined that when x hundred bicycles are built, the average cost per bicycle is given by C(x) = 0.1x^2 - 1.6x + 8.78, where C(x) is in hundreds of doll

Algebra ->  Quadratic Equations and Parabolas  -> Quadratic Equations Lessons  -> Quadratic Equation Lesson -> SOLUTION: Aki's bicycle designs has determined that when x hundred bicycles are built, the average cost per bicycle is given by C(x) = 0.1x^2 - 1.6x + 8.78, where C(x) is in hundreds of doll      Log On


   



Question 395572: Aki's bicycle designs has determined that when x hundred bicycles are built, the average cost per bicycle is given by C(x) = 0.1x^2 - 1.6x + 8.78, where C(x) is in hundreds of dollars. How many bicycles should the shop build to minimize the average cost per bucycle?
The shop should build ___ bicycles?

Answer by jrfrunner(365) About Me  (Show Source):
You can put this solution on YOUR website!
Problem was solved already 394690