SOLUTION: It cost Acme Manufacturing C dollars per hour to operate its golf ball division. An analyst has determined that C is related to the number of golf balls produced per hour, x, by t
Question 23342: It cost Acme Manufacturing C dollars per hour to operate its golf ball division. An analyst has determined that C is related to the number of golf balls produced per hour, x, by the equations C = 0.009x^2 - 1.8x + 100. What number of balls per hour should Acme produce to minimize the cost per hour of manufacturing these golf balls? Answer by stanbon(75887) (Show Source):
You can put this solution on YOUR website! Cost is a quadratic equation with a=0.009, b=-1.8, c=100
The max or min is at x=-b/2a = 1.8/0.018 = 100
You need to produce 100 golf balls per hour.