SOLUTION: The manager of a factory has found the output at the factory can be modeled by the function T(n)=-0.2n squared+8n-24, where n is the number of workers at the factory and T is the o
Algebra ->
Coordinate Systems and Linear Equations
-> SOLUTION: The manager of a factory has found the output at the factory can be modeled by the function T(n)=-0.2n squared+8n-24, where n is the number of workers at the factory and T is the o
Log On
Question 283681: The manager of a factory has found the output at the factory can be modeled by the function T(n)=-0.2n squared+8n-24, where n is the number of workers at the factory and T is the output. Find the number of workers,n, needed to maximize the output. Then find the maximum output with with that number of workers..
I have no idea how to solve this one. Answer by scott8148(6628) (Show Source):