Questions on Word Problems: Rate of work, PAINTING, Pool Filling answered by real tutors!

Algebra ->  Rate-of-work-word-problems -> Questions on Word Problems: Rate of work, PAINTING, Pool Filling answered by real tutors!      Log On


   



Tutors Answer Your Questions about Rate-of-work-word-problems (FREE)


Question 1080951: Every morning Diane runs 6 miles in about an hour. What is her rate in feet per second? What equations would you use to solve? Explain and show your work. Please show the work.
Click here to see answer by Boreal(15235) About Me 

Question 1081114: Owners of a recreation area are filling a small pond with water. They are adding water at a rate of 35 liters per minute. There are 500 liters in the pond to start.
Let W represent the amount of water in the pond (in liters) and let T represent the number of minutes that water has been added. Write an equation relating W to T, and then graph your equation.

Click here to see answer by math_helper(2461) About Me 

Question 1081541: A steel company has three blast furnaces of varying sizes. If furnaces A,B, and C are used full time, 800 metric tons of steel produced per day. If A and B are used half time while C at full time, 545 metric tons are produced. If A is not used, B as full time, and C as half-time, 410 metric tons are produced. How many metric tons per day does each furnace produce?
Click here to see answer by ikleyn(52754) About Me 

Question 1081540: A swimming pool holds 54 cubic meters of water. It can be drained at a rate of one cubic meter minute faster than it can be filled. If it takes 9 minutes longer to fill it than to drain it, find the drainage rate.
Click here to see answer by ikleyn(52754) About Me 

Question 1081555: Two truck drivers are hired to haul a pile of rubble away from a fight the two trucks have load capacities of 4.5 tons and 11 tons between the two trucks there were 28 trips made in 204 tons hauled away how many trips did each truck make
Click here to see answer by addingup(3677) About Me 
Question 1081555: Two truck drivers are hired to haul a pile of rubble away from a fight the two trucks have load capacities of 4.5 tons and 11 tons between the two trucks there were 28 trips made in 204 tons hauled away how many trips did each truck make
Click here to see answer by Fombitz(32388) About Me 

Question 1081573: Ben paints a house in 30 hours and Amy paints one in 82.5 hours. How long does it take to paint the house together?
Click here to see answer by ankor@dixie-net.com(22740) About Me 

Question 1081944: 80 men can finish the job in 60 days. At the 16th day, 5 men were laid off and at the 45th day, 10 men were hired. How many days were they delayed finishing the job.
Click here to see answer by josmiceli(19441) About Me 
Question 1081944: 80 men can finish the job in 60 days. At the 16th day, 5 men were laid off and at the 45th day, 10 men were hired. How many days were they delayed finishing the job.
Click here to see answer by Theo(13342) About Me 

Question 1082145: 20 artisans can accomplish a job in 30 straight days, 25 artisans were hired at the beginning and 10 resigned after 20 days. How long will it take for the remaining artisans to finish the whole job?

Click here to see answer by josgarithmetic(39613) About Me 

Question 1082136: Eight men can excavate 15 cubic meters of drainage canal in 7 hours. Three men can backfill 10 cubic meters in 4 hours. How long will it take for the 10 men to excavate and backfill 20 cubic meters in the project?
Click here to see answer by ikleyn(52754) About Me 

Question 1082144: 20 artisans can accomplish a job in 30 straight days, 25 artisans were hired at the beginning and 10 resigned after 20 days. How long will it take for the remaining artisans to finish the whole job?
Click here to see answer by jorel1380(3719) About Me 

Question 1082143: 28 peons can finish the job in 60 days,. At the start of 16th day 5 peons were laid off and after the 45th days, 10 more peons were hired. How many days they were delayed finishing the job?
Click here to see answer by jorel1380(3719) About Me 

Question 1082134: A certain job can be done by 72 men in 100 days. There were 80 men at the start of the project, there were 30 of them were fired at nth day. So if the workforce of the remaining men are to finish the job by 70 days. Find the nth day the lost men were fired.
Click here to see answer by jorel1380(3719) About Me 

Question 1082623: Bob working alone could complete a particular job in 4.5 hrs, and Jim could complete it alone in 3.7 hours. How long does it take to complete the job when they work together?
Click here to see answer by ikleyn(52754) About Me 

Question 23843: Next door neighbors Bob and Jim use hoses from both houses to fill Bob's swimming pool. They know it takes 18 hours using both houses. They also know that Bob's hose, used alone, takes 20% less time than Jim's hose alone. How much time is required to fill the pool by each hose alone?
Thanks for your help!
Dan

Click here to see answer by adamhen894(15) About Me 
Question 23843: Next door neighbors Bob and Jim use hoses from both houses to fill Bob's swimming pool. They know it takes 18 hours using both houses. They also know that Bob's hose, used alone, takes 20% less time than Jim's hose alone. How much time is required to fill the pool by each hose alone?
Thanks for your help!
Dan

Click here to see answer by josgarithmetic(39613) About Me 
Question 23843: Next door neighbors Bob and Jim use hoses from both houses to fill Bob's swimming pool. They know it takes 18 hours using both houses. They also know that Bob's hose, used alone, takes 20% less time than Jim's hose alone. How much time is required to fill the pool by each hose alone?
Thanks for your help!
Dan

Click here to see answer by ikleyn(52754) About Me 

Question 1083512: Joe can assemble a computer​ by himself in 60 minutes. Working with an assistant, he can assemble a computer in 50 minutes. How long would it take his assistant to do it working alone?

Click here to see answer by Boreal(15235) About Me 

Question 1083621: Greg and Joan are trying to decide whether to take on a job that is scheduled to take them 8 days to complete if they work together. The problem is, that while this is a very well paying job, they have only 8 days of vacation and they don’t wish to spend the whole vacation working. But they do need the money. . . To their joy, Brenda said that she could use some extra income too, and she’d like to join them in the job. Assuming the friends all work at the same rate, how much time will the job take all three friends to complete if they work together?
Click here to see answer by josgarithmetic(39613) About Me 

Question 1083622: Greg and Joan are trying to decide whether to take on a job that is scheduled to take them 8 days to complete if they work together. The problem is, that while this is a very well paying job, they have only 8 days of vacation and they don’t wish to spend the whole vacation working. But they do need the money. . . To their joy, Brenda said that she could use some extra income too, and she’d like to join them in the job. Assuming the friends all work at the same rate, how much time will the job take all three friends to complete if they work together?
Click here to see answer by josmiceli(19441) About Me 
Question 1083622: Greg and Joan are trying to decide whether to take on a job that is scheduled to take them 8 days to complete if they work together. The problem is, that while this is a very well paying job, they have only 8 days of vacation and they don’t wish to spend the whole vacation working. But they do need the money. . . To their joy, Brenda said that she could use some extra income too, and she’d like to join them in the job. Assuming the friends all work at the same rate, how much time will the job take all three friends to complete if they work together?
Click here to see answer by Boreal(15235) About Me 
Question 1083622: Greg and Joan are trying to decide whether to take on a job that is scheduled to take them 8 days to complete if they work together. The problem is, that while this is a very well paying job, they have only 8 days of vacation and they don’t wish to spend the whole vacation working. But they do need the money. . . To their joy, Brenda said that she could use some extra income too, and she’d like to join them in the job. Assuming the friends all work at the same rate, how much time will the job take all three friends to complete if they work together?
Click here to see answer by MathTherapy(10549) About Me 

Question 1083857: At a fixed temperature, the resistance R of a wire varies directly as the length 1 and inversely as the square of its diameter d. If the resistance is 1.2 ohm when the diameter is 1 mm and the length is 240 cm, what is the resistance when the diameter is 3 mm and the length is 610 cm?
Click here to see answer by Theo(13342) About Me 
Question 1083857: At a fixed temperature, the resistance R of a wire varies directly as the length 1 and inversely as the square of its diameter d. If the resistance is 1.2 ohm when the diameter is 1 mm and the length is 240 cm, what is the resistance when the diameter is 3 mm and the length is 610 cm?
Click here to see answer by MathTherapy(10549) About Me 

Question 1083866: If it takes 48 hours to build 6 tables how many hours will it take to build10
Click here to see answer by ikleyn(52754) About Me 

Question 1084024: Charlotte can finish her paper route in two hours. When Ralph helps, they finished in 45 minutes. How long would it take Ralph working alone?
I would really appreciate if this was answered asap. It's due tomorrow. Thanks!

Click here to see answer by josmiceli(19441) About Me 
Question 1084024: Charlotte can finish her paper route in two hours. When Ralph helps, they finished in 45 minutes. How long would it take Ralph working alone?
I would really appreciate if this was answered asap. It's due tomorrow. Thanks!

Click here to see answer by MathTherapy(10549) About Me 
Question 1084024: Charlotte can finish her paper route in two hours. When Ralph helps, they finished in 45 minutes. How long would it take Ralph working alone?
I would really appreciate if this was answered asap. It's due tomorrow. Thanks!

Click here to see answer by josgarithmetic(39613) About Me 

Question 1084133: Please simplify and clearly define these terms: "Rate," "Time,"and "Work Done," as it relates to the work done by one or more persons.
Thanks so much.

Click here to see answer by ikleyn(52754) About Me 

Question 1084206: Another event at super challenge day is the lawn mower derby. Team members try to mow a standard sized lawn as quickly as possible. Terri and Candace can mow the lawn in 18min. If it takes Candace 30min to mow a lawn alone, how long does it take Terri to mow the lawn alone?
Click here to see answer by Theo(13342) About Me 
Question 1084206: Another event at super challenge day is the lawn mower derby. Team members try to mow a standard sized lawn as quickly as possible. Terri and Candace can mow the lawn in 18min. If it takes Candace 30min to mow a lawn alone, how long does it take Terri to mow the lawn alone?
Click here to see answer by ikleyn(52754) About Me 

Question 1084280: Hi could you help me answer this question.Thanks!
2 men can unload 250kg of goods in 9 hours.How many men are needed to unload 625kg of goods in 3 hours?

Click here to see answer by josgarithmetic(39613) About Me 

Question 1084281: 5 men paint a house in 20 days 8 women paint a house in 25 days 10 boys paint samne house in 30 days then how many day will spent if 2 man and 6 women 5 boys will paint it..
Click here to see answer by josgarithmetic(39613) About Me 

Question 1084289: length of square classroom is 15metre.Find the cost of axing coloured tiles on classroom at the rate of Rs.20 per metre
Click here to see answer by Fombitz(32388) About Me 

Question 1084562: Joe and Ann rode their tandem bike uphill for 6 miles at a speed of 10 miles per hour. They rode back down along the same route at a rate of 15 miles per hour. What was their aver- age speed and how long were they riding?
Click here to see answer by jorel1380(3719) About Me 

Question 1084569: Xavier drove 100 miles at a rate of 60 miles per hour and then he drove another 100 miles at a rate of 40 miles per hour. How long was he driving? What was his average speed?
Click here to see answer by Alan3354(69443) About Me 

Question 1084590: Javier and Bobby are rolling the pennies in their penny jar. Javier can make 4 rolls in 10 minutes and Bobby can make 9 rolls in 15 minutes.
(a) Working together, how long will it take them to roll $50 worth of pennies? (Penny rolls have 50¢ per roll.)
76 problem solving in mathematics
(b) If it takes them 31 hours to roll all of the pennies, how much 2
money do they have?

Click here to see answer by josgarithmetic(39613) About Me 

Question 1084853: if it takes 10men 20 seconds to finish a piece of work,how many seconds will it take 2 men to finish that same piece of work?
Click here to see answer by Alan3354(69443) About Me 

Question 1084878: Stan and Hilda can mow the lawn in 60 minutes if they work together. If Hilda works twice as fast as Stan, how long does it take Stan to mow the lawn alone?
Click here to see answer by Boreal(15235) About Me 

Question 1084879: Betty and Karen have been hired to paint the house in the new development. Working together the women can paint a house in two-thirds the time it takes Karen working alone. Betty takes 12 hours to paint a house alone. How long does it take Karen to paint a house working alone?
Click here to see answer by jorel1380(3719) About Me 

Question 1085187: If a rock is thrown upwards with an initial velocity of 25 m/s from a cliff
that is 5 m above the ground, where h denotes height and t denotes time.
The equatin given for this relation is h = -6 t2 + 24t+5
a. How high is the rock after 3 seconds?
b. When will the rock reach a height of 29 m?
c. When will the rock reach the ground?

Click here to see answer by jorel1380(3719) About Me 
Question 1085187: If a rock is thrown upwards with an initial velocity of 25 m/s from a cliff
that is 5 m above the ground, where h denotes height and t denotes time.
The equatin given for this relation is h = -6 t2 + 24t+5
a. How high is the rock after 3 seconds?
b. When will the rock reach a height of 29 m?
c. When will the rock reach the ground?

Click here to see answer by ikleyn(52754) About Me 

Question 1085290: One grocery clerk can stock the shelf in 15 minutes where as a second clerk requires 30 minutes to stock the same shelf how long would it take to stock the shelf if the two clerk work together
Click here to see answer by Boreal(15235) About Me 

Question 1085442: a and b can do a piece of work in 18 days, b and c can do it in 24 days while c and a can finish it in 36 days . In how many days did A finish it alone ?
Click here to see answer by ikleyn(52754) About Me 

Older solutions: 1..45, 46..90, 91..135, 136..180, 181..225, 226..270, 271..315, 316..360, 361..405, 406..450, 451..495, 496..540, 541..585, 586..630, 631..675, 676..720, 721..765, 766..810, 811..855, 856..900, 901..945, 946..990, 991..1035, 1036..1080, 1081..1125, 1126..1170, 1171..1215, 1216..1260, 1261..1305, 1306..1350, 1351..1395, 1396..1440, 1441..1485, 1486..1530, 1531..1575, 1576..1620, 1621..1665, 1666..1710, 1711..1755, 1756..1800, 1801..1845, 1846..1890, 1891..1935, 1936..1980, 1981..2025, 2026..2070, 2071..2115, 2116..2160, 2161..2205, 2206..2250, 2251..2295, 2296..2340, 2341..2385, 2386..2430, 2431..2475, 2476..2520, 2521..2565, 2566..2610, 2611..2655, 2656..2700, 2701..2745, 2746..2790, 2791..2835, 2836..2880, 2881..2925, 2926..2970, 2971..3015, 3016..3060, 3061..3105, 3106..3150, 3151..3195, 3196..3240, 3241..3285, 3286..3330, 3331..3375, 3376..3420, 3421..3465, 3466..3510, 3511..3555, 3556..3600, 3601..3645, 3646..3690, 3691..3735, 3736..3780, 3781..3825, 3826..3870, 3871..3915, 3916..3960, 3961..4005, 4006..4050, 4051..4095, 4096..4140, 4141..4185, 4186..4230, 4231..4275, 4276..4320, 4321..4365, 4366..4410, 4411..4455, 4456..4500, 4501..4545, 4546..4590, 4591..4635, 4636..4680, 4681..4725, 4726..4770, 4771..4815, 4816..4860, 4861..4905, 4906..4950, 4951..4995, 4996..5040, 5041..5085, 5086..5130, 5131..5175, 5176..5220, 5221..5265, 5266..5310, 5311..5355, 5356..5400, 5401..5445, 5446..5490, 5491..5535, 5536..5580, 5581..5625, 5626..5670, 5671..5715, 5716..5760, 5761..5805, 5806..5850, 5851..5895, 5896..5940, 5941..5985, 5986..6030, 6031..6075, 6076..6120, 6121..6165, 6166..6210, 6211..6255, 6256..6300, 6301..6345, 6346..6390, 6391..6435, 6436..6480, 6481..6525, 6526..6570, 6571..6615, 6616..6660, 6661..6705, 6706..6750, 6751..6795, 6796..6840, 6841..6885, 6886..6930, 6931..6975, 6976..7020, 7021..7065, 7066..7110, 7111..7155, 7156..7200, 7201..7245, 7246..7290, 7291..7335, 7336..7380, 7381..7425, 7426..7470, 7471..7515, 7516..7560, 7561..7605, 7606..7650, 7651..7695, 7696..7740, 7741..7785, 7786..7830, 7831..7875, 7876..7920, 7921..7965, 7966..8010, 8011..8055, 8056..8100, 8101..8145, 8146..8190, 8191..8235, 8236..8280, 8281..8325, 8326..8370, 8371..8415, 8416..8460, 8461..8505, 8506..8550, 8551..8595, 8596..8640, 8641..8685, 8686..8730, 8731..8775, 8776..8820, 8821..8865, 8866..8910