Question 1061623: An inlet pipe on a swimming pool can be used to fill the pool in 34 hours. The drain pipe can be used to empty the pool in 35 hours. if the pool is 1/2 filled and then the Inlet pipe and drain pipe are opened. how long from that time will it take to fill the pool?
Click here to see answer by Boreal(15235)  |
Question 1061670: a newsletter printing job needs to be done each week. using an older copy machine the job took 2.5 hours to complete. then a new machine was brought in and using both machines, the job could be completed in 1 hour. how long would it take the new machine to do the job alone
Click here to see answer by stanbon(75887) |
Question 1061794: James can paint a room in 4 hours, while Mike can paint the same room in 5 hours. Working together, how many hours will it take them to paint the room if James only works for one hour?
Dear tutor,
I solved this problem 3 ways, and I got the same answer, but I don't think I am understanding what is this problem really asking. Is it asking for the total time spent on the project (painting) OR is it asking for the time that Mike only spent working on the project?
Method 1:
J
1 job/4 hours
M
1 job/5 hours
Project Time
1 job/x hours
1 hour*(1 job/ 4 hours) + (x-1)*(1 job/5 hours) = 1 job
1/4 + (x-1)/5 = 1
5 + 4(x-1) = 20
x=19/4 = 4 3/4 hours = 4.75 hours
Based on my set-up (project time equal to 1 job/x hours), the x represents the project time. So, the whole project of painting the room is 4.75 hours. HOWEVER, THIS IS NOT LISTED AMONG ANSWER CHOICES!From this time, 1 hour is spent painting by James, and the rest by Mike. So Mike was painting for 3.75 hours. WHAT IS THE QUESTION REALLY ASKING, IS IT PAINTING BY MIKE OR PAINTING BY BOTH? IS THE ANSWER 3.75 HOURS OR 4.75 HOURS? I ANSWERED 4.75 HOURS, BUT IT'S THE WRONG ANSWER!
Method 2:
(3/4)job remaining and that job will be done now by M at the rate of 1 job/5 hours, therefore
(3/4)job/(1job/5hours) = 15hours/4=3 3/4 hours = 3.75 hours, so this is the time that M spent painting or that M spent on the project. Since J spent 1 hour on the project per givens in the question stem, then total time on the project is 4.75 hours. HOWEVER, 4.75 HOURS IS NOT AMONG ANSWER CHOICES, BUT 3.75 HOURS IS. I AM NOT SURE WHY.
Method 3:
1 hour*(1job/4hours) + x hours*(1job/5hours)=1 job
contribution of one person +contribution of second person gives me whole job
Since I don't know how many hours M worked on the project, I just set it to x hours.
1/4+x/5=1
x=15/4 hours = 3 3/4 hours=3.75 hours
This is the time that M spent on the project (painting). THE BOOK SAYS THAT 3.75 HOURS IS THE CORRECT ANSWER, BUT I AM NOT UNDERSTANDING WHY, SINCE THE QUESTION IS ASKING FOR TOTAL PROJECT TIME. ISN'T TOTAL PROJECT TIME 4.75 HOURS? WHY THEN THE ANSWER IS 3.75 HOURS?
Click here to see answer by josgarithmetic(39613) |
Question 1062414: It takes 6 people working at the same time 2 hours to put up a fence that is 80 feet long. Assuming all people work at the same speed, how long will it take 8 people to put up a fence that is 135 feet long?
Click here to see answer by ikleyn(52747)  |
Question 1062444: Tank A is cylindrical with diameter 22 ft and height 12 ft. Tank B is cylindrical with diameter 28 ft and height 18 ft. Both tanks start half full when the pumps are engaged. Pump A fills Tank A at 4.3 ft^3/s while pump B fills tank B at 2.1 ft^3/s. How long must the pumps work until the tanks have the same amount?
Click here to see answer by josgarithmetic(39613) |
Question 1062592: Owners of a recreation area are filling a small pond with water. They are adding water at a rate of
35
liters per minute. There are
700
liters in the pond to start.
Let W represent the amount of water in the pond (in liters), and let
T represent the number of minutes that water has been added. Write an equation relating
W to T, and then graph your equation using the axes below.
I am stuck on the graphing part. The graph shows the W = Y axis goes form 100-1,000 and the T = x axis goes from 1 -8.
How do I graph this?
Can you please help me.
Click here to see answer by ikleyn(52747)  |
Question 1063323: problem given to me is:Yolly can clean the room in 9 minutes and Marie can do it 60 minutes. if Yolly cleans the room for 15 minutes before Marie joins her, how long would it take them to finish? my question is how can i translate it to an equation?
Click here to see answer by josmiceli(19441)  |
|
Older solutions: 1..45, 46..90, 91..135, 136..180, 181..225, 226..270, 271..315, 316..360, 361..405, 406..450, 451..495, 496..540, 541..585, 586..630, 631..675, 676..720, 721..765, 766..810, 811..855, 856..900, 901..945, 946..990, 991..1035, 1036..1080, 1081..1125, 1126..1170, 1171..1215, 1216..1260, 1261..1305, 1306..1350, 1351..1395, 1396..1440, 1441..1485, 1486..1530, 1531..1575, 1576..1620, 1621..1665, 1666..1710, 1711..1755, 1756..1800, 1801..1845, 1846..1890, 1891..1935, 1936..1980, 1981..2025, 2026..2070, 2071..2115, 2116..2160, 2161..2205, 2206..2250, 2251..2295, 2296..2340, 2341..2385, 2386..2430, 2431..2475, 2476..2520, 2521..2565, 2566..2610, 2611..2655, 2656..2700, 2701..2745, 2746..2790, 2791..2835, 2836..2880, 2881..2925, 2926..2970, 2971..3015, 3016..3060, 3061..3105, 3106..3150, 3151..3195, 3196..3240, 3241..3285, 3286..3330, 3331..3375, 3376..3420, 3421..3465, 3466..3510, 3511..3555, 3556..3600, 3601..3645, 3646..3690, 3691..3735, 3736..3780, 3781..3825, 3826..3870, 3871..3915, 3916..3960, 3961..4005, 4006..4050, 4051..4095, 4096..4140, 4141..4185, 4186..4230, 4231..4275, 4276..4320, 4321..4365, 4366..4410, 4411..4455, 4456..4500, 4501..4545, 4546..4590, 4591..4635, 4636..4680, 4681..4725, 4726..4770, 4771..4815, 4816..4860, 4861..4905, 4906..4950, 4951..4995, 4996..5040, 5041..5085, 5086..5130, 5131..5175, 5176..5220, 5221..5265, 5266..5310, 5311..5355, 5356..5400, 5401..5445, 5446..5490, 5491..5535, 5536..5580, 5581..5625, 5626..5670, 5671..5715, 5716..5760, 5761..5805, 5806..5850, 5851..5895, 5896..5940, 5941..5985, 5986..6030, 6031..6075, 6076..6120, 6121..6165, 6166..6210, 6211..6255, 6256..6300, 6301..6345, 6346..6390, 6391..6435, 6436..6480, 6481..6525, 6526..6570, 6571..6615, 6616..6660, 6661..6705, 6706..6750, 6751..6795, 6796..6840, 6841..6885, 6886..6930, 6931..6975, 6976..7020, 7021..7065, 7066..7110, 7111..7155, 7156..7200, 7201..7245, 7246..7290, 7291..7335, 7336..7380, 7381..7425, 7426..7470, 7471..7515, 7516..7560, 7561..7605, 7606..7650, 7651..7695, 7696..7740, 7741..7785, 7786..7830, 7831..7875, 7876..7920, 7921..7965, 7966..8010, 8011..8055, 8056..8100, 8101..8145, 8146..8190, 8191..8235, 8236..8280, 8281..8325, 8326..8370, 8371..8415, 8416..8460, 8461..8505, 8506..8550, 8551..8595, 8596..8640, 8641..8685, 8686..8730, 8731..8775, 8776..8820, 8821..8865, 8866..8910
|
| |