|
Tutors Answer Your Questions about Rate-of-work-word-problems (FREE)
Question 823594: Hello, I have a problem, that I dont know what am I doing wrong with it.The problem is like this:
A vendor sends an invoice that totals $6115.68, this invoice contains 2 types of products that have different prices.
Product 1: $1.65 per case
Product 2: $2.46 per case.
How many cases of each product is the vendor charging for?
I just cant figure out how to do this, can someone please explain me?
Click here to see answer by josgarithmetic(39613) |
Question 823594: Hello, I have a problem, that I dont know what am I doing wrong with it.The problem is like this:
A vendor sends an invoice that totals $6115.68, this invoice contains 2 types of products that have different prices.
Product 1: $1.65 per case
Product 2: $2.46 per case.
How many cases of each product is the vendor charging for?
I just cant figure out how to do this, can someone please explain me?
Click here to see answer by KMST(5328)  |
Question 823903: 12 men take 27 hours to paint a house. Given that all the men work at the same rate, find how long it will take 9 men to paint the same house. I would really appreciate your time and effort if you could help me with this question. I really don't know a method to solve it. Thanks!
Click here to see answer by josgarithmetic(39613) |
Question 823903: 12 men take 27 hours to paint a house. Given that all the men work at the same rate, find how long it will take 9 men to paint the same house. I would really appreciate your time and effort if you could help me with this question. I really don't know a method to solve it. Thanks!
Click here to see answer by richwmiller(17219)  |
Question 821463: Water is pouring into a tank at a constant rate. When the tank is full, 10 pumps of equal capacity empty the tank
in 12 hrs, while 15 pumps of the same capacity empty the tank in 6 hrs. The time which 25 pumps of the same
capacity take to empty the tank, if the tank is initially full, will be : (All the pipes pouring water into the tank are
always open)
Click here to see answer by richwmiller(17219)  |
Question 824023: A road contractor wanted to build a 200 meter long road in 30 days and employed 20 workers. At the end of 15 days, he found that only 80 meter of the road has been completed. How many more worker he must employ to complete the work in time?
Click here to see answer by MathTherapy(10549)  |
Question 824335: Bob can overhaul a boat's diesel inboard engine in 15hrs. His apprentice takes 30hrs to do the same job. How long would it take them working together assuming no gain or loss in efficiency?
multiple choice:
10hr
45hr
6hr
4hr
Click here to see answer by milo1954(10) |
Question 824343: Solve the problem.
An experienced bank auditor can check a bank's deposits twice as fast as a new auditor. Working together it takes the auditors 4 hours to do the job. How long would it take the experienced auditor working alone?
Click here to see answer by milo1954(10) |
Question 824343: Solve the problem.
An experienced bank auditor can check a bank's deposits twice as fast as a new auditor. Working together it takes the auditors 4 hours to do the job. How long would it take the experienced auditor working alone?
Click here to see answer by josmiceli(19441)  |
Question 824377: Pipe A takes 16 min to fill a tank. Pipes B and C, whose cross-sectional circumferences are in the ratio 2:3, fill another tank twice as big as the first. If A has a cross-sectional circumference that is one-third of C, how long will it take for B and C to fill the second tank? (Assume the rate at which water flows through a unit cross-sectional area is same for all the three pipes.)
Click here to see answer by Edwin McCravy(20054)  |
Question 820649: Two pumps of different sizes, working together, can empty a tank in 7 hours. The larger pump can empty the tank in 4 hours less than the smaller pump. If the larger pump is out of order, how long will it take the smaller pump to complete the job?
Click here to see answer by richwmiller(17219)  |
Question 824800: Rafael designed a sequined dress to be worn at the a academy awards. maris can sew all the dequins in 10 hr less time than stephanie. to save time he gave the job to both women and got all the sequins attached in 17 hrs. how long would it have taken stephanie working alone.
Click here to see answer by stanbon(75887) |
Question 824909: Two pipes can fill a tank in 18 minutes & 27 minutes individually.A third pipe can empty the full tank in 6 minutes.All the three pipes are opened when the tank was 2/3 full.In how many minute will the tank become empty?
A)11
B)9
Click here to see answer by Edwin McCravy(20054)  |
Question 824909: Two pipes can fill a tank in 18 minutes & 27 minutes individually.A third pipe can empty the full tank in 6 minutes.All the three pipes are opened when the tank was 2/3 full.In how many minute will the tank become empty?
A)11
B)9
Click here to see answer by AnlytcPhil(1806)  |
Question 825081: How would I solve this?
2 men are painting identical size houses. It takes one man 5 hours to paint a house. It takes the other man 3 hours to paint a house. How long would it take if both men paint the same size house together?
Click here to see answer by MathLover1(20849)  |
Question 825275: Josephine fills up a swimming pool, measuring 30 m by 16 m, using a hose of radius 6 cm. If the pool is flat and the water flows at 18 km/h, what will be the depth of water (in cm) in the pool after 2.5 hours? Round off your answer to 3 significant figures.
Click here to see answer by josgarithmetic(39613) |
|
Older solutions: 1..45, 46..90, 91..135, 136..180, 181..225, 226..270, 271..315, 316..360, 361..405, 406..450, 451..495, 496..540, 541..585, 586..630, 631..675, 676..720, 721..765, 766..810, 811..855, 856..900, 901..945, 946..990, 991..1035, 1036..1080, 1081..1125, 1126..1170, 1171..1215, 1216..1260, 1261..1305, 1306..1350, 1351..1395, 1396..1440, 1441..1485, 1486..1530, 1531..1575, 1576..1620, 1621..1665, 1666..1710, 1711..1755, 1756..1800, 1801..1845, 1846..1890, 1891..1935, 1936..1980, 1981..2025, 2026..2070, 2071..2115, 2116..2160, 2161..2205, 2206..2250, 2251..2295, 2296..2340, 2341..2385, 2386..2430, 2431..2475, 2476..2520, 2521..2565, 2566..2610, 2611..2655, 2656..2700, 2701..2745, 2746..2790, 2791..2835, 2836..2880, 2881..2925, 2926..2970, 2971..3015, 3016..3060, 3061..3105, 3106..3150, 3151..3195, 3196..3240, 3241..3285, 3286..3330, 3331..3375, 3376..3420, 3421..3465, 3466..3510, 3511..3555, 3556..3600, 3601..3645, 3646..3690, 3691..3735, 3736..3780, 3781..3825, 3826..3870, 3871..3915, 3916..3960, 3961..4005, 4006..4050, 4051..4095, 4096..4140, 4141..4185, 4186..4230, 4231..4275, 4276..4320, 4321..4365, 4366..4410, 4411..4455, 4456..4500, 4501..4545, 4546..4590, 4591..4635, 4636..4680, 4681..4725, 4726..4770, 4771..4815, 4816..4860, 4861..4905, 4906..4950, 4951..4995, 4996..5040, 5041..5085, 5086..5130, 5131..5175, 5176..5220, 5221..5265, 5266..5310, 5311..5355, 5356..5400, 5401..5445, 5446..5490, 5491..5535, 5536..5580, 5581..5625, 5626..5670, 5671..5715, 5716..5760, 5761..5805, 5806..5850, 5851..5895, 5896..5940, 5941..5985, 5986..6030, 6031..6075, 6076..6120, 6121..6165, 6166..6210, 6211..6255, 6256..6300, 6301..6345, 6346..6390, 6391..6435, 6436..6480, 6481..6525, 6526..6570, 6571..6615, 6616..6660, 6661..6705, 6706..6750, 6751..6795, 6796..6840, 6841..6885, 6886..6930, 6931..6975, 6976..7020, 7021..7065, 7066..7110, 7111..7155, 7156..7200, 7201..7245, 7246..7290, 7291..7335, 7336..7380, 7381..7425, 7426..7470, 7471..7515, 7516..7560, 7561..7605, 7606..7650, 7651..7695, 7696..7740, 7741..7785, 7786..7830, 7831..7875, 7876..7920, 7921..7965, 7966..8010, 8011..8055, 8056..8100, 8101..8145, 8146..8190, 8191..8235, 8236..8280, 8281..8325, 8326..8370, 8371..8415, 8416..8460, 8461..8505, 8506..8550, 8551..8595, 8596..8640, 8641..8685, 8686..8730, 8731..8775, 8776..8820, 8821..8865, 8866..8910
|
| |