SOLUTION: A contractor hired two electricians to do a job. One did 1/5 of the job and the other did 1/4 of the job. Did the job get completed? If not, what fraction of the job is left?
Algebra ->
Rate-of-work-word-problems
-> SOLUTION: A contractor hired two electricians to do a job. One did 1/5 of the job and the other did 1/4 of the job. Did the job get completed? If not, what fraction of the job is left?
Log On
Question 995227: A contractor hired two electricians to do a job. One did 1/5 of the job and the other did 1/4 of the job. Did the job get completed? If not, what fraction of the job is left? Answer by fractalier(6550) (Show Source):