SOLUTION: A carpenter can do a job in two hours. His assistant can do the same job in three hours. How long would it take them to do the job together?

Algebra.Com
Question 971873: A carpenter can do a job in two hours. His assistant can do the same job in three hours. How long would it take them to do the job together?
Answer by anand429(138)   (Show Source): You can put this solution on YOUR website!
Carpenter's rate of work = 1/2 units per hour
Assistant's rate of work = 1/3 units per hour
Their combined rate of work = units per hour
= units per hour
So, time required to do the job together
= hours
= hours

RELATED QUESTIONS

A carpenter can do a job in four hours. His assistant can do the same job in six hours.... (answered by josgarithmetic,ikleyn)
johnny can do a job in 6 hours. jeffrey can do the same job in 9 hours. how long would it (answered by ewatrrr)
a painter can paint a house in 6 hours her assistant takes 8 hours to do the same job.... (answered by TimothyLamb)
If donald can perfrom a job working alone in 4 hours,and his brother mark can do the same (answered by lwsshak3)
Barry can do a certain job in 3 hours. whereas it takes Sanchez 5 hours to do the same... (answered by AgusKwan)
Barry can do a certain job in 2 hours, where as it takes Sanchez 3 hours to do the same... (answered by checkley71)
Barry can do a certain job in 10 hours, whereas it takes Samuel 12 hours to do the same... (answered by drcole)
Barry can do a certain job in 6 hours, whereas it takes Samuel 9 hours to do the same... (answered by stanbon)
Barry can do a certain job in 9 hours, whereas it takes Samuel 11 hours to do the same... (answered by Alan3354)