SOLUTION: 41. Mr. Agbuya can mow a lawn in 3 hours. His sons, Michael and Ariel, can each do the job in 2 hours. If the father and the sons work together, how long would it take them to mow
Algebra ->
Rate-of-work-word-problems
-> SOLUTION: 41. Mr. Agbuya can mow a lawn in 3 hours. His sons, Michael and Ariel, can each do the job in 2 hours. If the father and the sons work together, how long would it take them to mow
Log On
Question 927834: 41. Mr. Agbuya can mow a lawn in 3 hours. His sons, Michael and Ariel, can each do the job in 2 hours. If the father and the sons work together, how long would it take them to mow the lawn?
So Mr. Agbuya's mowing rate is 1 lawn per 3 hours or or
His sons, Michael and Ariel, can each do the job in 2 hours.
So each of thir mowing rates is 1 lawn per 2 hours or or
If the father and the sons work together, how long would it take them to mow the lawn?
Let the answer by x hours.
Then their combined mowing rate is 1 lawn per x hours or or
The equation comes from
Clear of fractions by multiplying through by LCD of 6x.
Solve and get hour. So the can mow the lawn is 45 minutes.
Edwin