Question 923881: A man and a boy together can complete a work in 24 days. If for the last 6 days the man alone does the work it is completed in 26 days. How long the boy will take to complete the work alone.
Found 3 solutions by josgarithmetic, ankor@dixie-net.com, MathTherapy: Answer by josgarithmetic(39616) (Show Source):
You can put this solution on YOUR website! RATES, JOB/DAY
Boy, 1/x
Man , 1/y
BothTogether, 1/24
The man alone finished part of the job in 6 days.

and
;
Still not enough. Three variables but only two equations.
The description part for the last 6 days the man alone does the work it is completed in 26 days. is contradictory. How many days did the man work alone? 6 or 26 ?
Answer by ankor@dixie-net.com(22740) (Show Source): Answer by MathTherapy(10551) (Show Source):
You can put this solution on YOUR website! A man and a boy together can complete a work in 24 days. If for the last 6 days the man alone does the work it is completed in 26 days. How long the boy will take to complete the work alone.
Based on the explanation, it appears as though the job was completed in a TOTAL of 26 days as opposed to
24 planned days, with the boy and man working 18 days together. Thus, the man seemed to have completed
the remaining 1/4 of work in 8 (26 - 18) days
If all this is true, then:
Time boy takes, alone to do job is: days
You can do the check!!
===================
If you need a complete and detailed solution, let me know!!
Send comments, “thank-yous,” and inquiries to “D” at MathMadEzy@aol.com.
Further help is available, online or in-person, for a fee, obviously.
For FREE info and answers to questions about the ASVAB exam, the NYS 3 – 8 city/state wide exams,GENERAL
MATH and HOMEWORK QUESTIONS, or MATH QUESTIONS related to the Regents Integrated Algebra,
Regents Geometry, Regents Algebra 2/Trigonometry, SHSAT, COOP/HSPT/TACHS, PSAT, SAT, ACT, SSAT/ISEE,
GRE, CLEP, and the TASC/GED, you can visit: http://asvabstudyzone.freeforums.net/.
|
|
|
| |