Question 908550: If it takes 2 men 2 hours to dig a hole 3 foot long, 3 foot wide, 3 foot deep. How long, working at the same pace, would it take to dig a hole 6 foot long, 6 foot wide, 6 foot deep?
Answer by solver91311(24713) (Show Source):
You can put this solution on YOUR website!
The bigger hole is 2 times longer, 2 times wider, and 2 times deeper. 2 times 2 times 2 is 8. So the volume of the bigger hole is 8 times greater than the volume of the smaller hole. It would take 8 times longer, or 2 men 16 hours.
John

My calculator said it, I believe it, that settles it
|
|
|