SOLUTION: if a 12 men can dig in a pond in 8 days how many can dig it in 6 days?

Algebra ->  Rate-of-work-word-problems -> SOLUTION: if a 12 men can dig in a pond in 8 days how many can dig it in 6 days?       Log On


   



Question 898360: if a 12 men can dig in a pond in 8 days how many can dig it in 6 days?

Found 5 solutions by lwsshak3, saw, greenestamps, ikleyn, Alan3354:
Answer by lwsshak3(11628) About Me  (Show Source):
You can put this solution on YOUR website!
if a 12 men can dig in a pond in 8 days how many can dig it in 6 days?
***
12 men working 8 days to dig a pond=96 man-days
working 6 days to dig the same pond will require 96/6=16 men

Answer by saw(34) About Me  (Show Source):
You can put this solution on YOUR website!
If 12 men can dig in a pond in 8 days
12*8 = 96 men workforce
In 8 days
96/8 = 12 men
Let x be the men needed to dig it in 6 days
In 6 days
96/6 = x men
16 men

Answer by greenestamps(13200) About Me  (Show Source):
You can put this solution on YOUR website!


If the job is to be completed in 6/8 = 3/4 as many days, the number of workers required is 4/3 as many.

12%2A%284%2F3%29+=+16

ANSWER: 16 men


Answer by ikleyn(52781) About Me  (Show Source):
You can put this solution on YOUR website!
.
if highlight%28cross%28a%29%29 12 men can dig in a pond in 8 days how many can dig it in 6 days?
~~~~~~~~~~~~~~~



The entire job is 12*8 = 96 man-days.


To complete it in 6 days,  96%2F6 = 16 workers are needed.

Solved.

----------------------

Look how I edited your post.

Learn English from my post in parallel with Math, and have doubled benefits.


Answer by Alan3354(69443) About Me  (Show Source):
You can put this solution on YOUR website!
if a 12 men can dig in a pond in 8 days how many can dig it in 6 days?
----------
Poorly worded problem.
Any # >=16 can dig it in 6 days, and then have time for a break if it's greater than 16.
==========
If 12 men can dig in a pond in 8 days, how many are needed to dig it in 6 days?