SOLUTION: if 6 men take 3 days to dig 8 ditches, then how long would it take for 4 men to dig 10 ditches?
i tried doing 8 ditches x (18men per day) divided by 10 ditches = 14.4 men per di
Algebra ->
Rate-of-work-word-problems
-> SOLUTION: if 6 men take 3 days to dig 8 ditches, then how long would it take for 4 men to dig 10 ditches?
i tried doing 8 ditches x (18men per day) divided by 10 ditches = 14.4 men per di
Log On
Question 844029: if 6 men take 3 days to dig 8 ditches, then how long would it take for 4 men to dig 10 ditches?
i tried doing 8 ditches x (18men per day) divided by 10 ditches = 14.4 men per ditch but i don't know where i went wrong. Answer by josmiceli(19441) (Show Source):
You can put this solution on YOUR website! 6 men take 3 days to dig 8 ditches
-------------------------------
1/3 as many men would take 3 times longer
to dig the same number of ditches, so
-------------------------------
2 men take 9 days to dig 8 ditches
-------------------------------
twice as many men take half as long
to dig the same number of ditches, so
-------------------------------
4 men take 9/2 days to dig 8 ditches
-------------------------------
The same number of men take 1/4 of that
time to build 1/4 as many ditches, so
--------------------------------
4 men take 9/8 days to build 2 bridges
--------------------------------
It takes 5 times as long for the same number
of men to dig 5 times as many bridges, so
--------------------------------
4 men take 45/8 days to build 10 bridges
--------------------------------
4 men take 5 and 5/8 days to build 10 bridges