SOLUTION: It takes four people days to dig a small field. How long would it take three people to do the same work
Algebra.Com
Question 1191316: It takes four people days to dig a small field. How long would it take three people to do the same work
Answer by Alan3354(69443) (Show Source): You can put this solution on YOUR website!
It takes four people days to dig a small field. How long would it take three people to do the same work
-------------------
4/3 as many days.
RELATED QUESTIONS
It takes 4 people 3 days to dig a small field how long would it take 3 people to do the... (answered by josgarithmetic)
I it takes 7 people 8 days to dig a ditch, how many people would it take to dig it in 1/2 (answered by richwmiller)
It takes 6 people 6 days to do a job. How many days would it take 2 people working at the (answered by josmiceli)
It takes 3 people 20 days to finish a job. How long will it take 4 people working at the (answered by stanbon)
if it takes 7 people 15 days to do a job, how long will it take 3 people to do the same... (answered by ankor@dixie-net.com)
It takes 3 people 15 days to complete a big job, how long will it take 5 people to do the (answered by alicealc)
It takes 8 people 3 days to dig a ditch that is 1,000 feet long, how long will it take 4... (answered by Fombitz,stanbon)
it takes tweanty-four days for eighteen people,who are all working together at the same... (answered by ewatrrr)
if it takes 2 people 3 days to do a job how long would it take 5 people to do it... (answered by flame8855,slaborn)