SOLUTION: A can do as much work in 5 days as B can do in 6 days.If both of them work together can do the work in 12 days,in how many days can each of them complete the work alone?

Algebra.Com
Question 1062647: A can do as much work in 5 days as B can do in 6 days.If both of them work together can do the work in 12 days,in how many days can each of them complete the work alone?
Answer by josmiceli(19441)   (Show Source): You can put this solution on YOUR website!
Let = A's rate of working
Let = B's rate of working
( A works faster than B )


-------------------------
Working together, their rate is
which is [ 1 job done ] / [ 12 days ]




and




----------------------------
A can do the job in 22 days
B can do the job in 26.4 days
-----------------------------
check:



close enough
Get another opinion, too, if needed

RELATED QUESTIONS

In 5 days A can do as much work as B in 6 days. If they work together they can complete 1 (answered by richwmiller)
A can do a piece of work in 2 days as B can do in 3 days. B can do as much work in 4 days (answered by ankor@dixie-net.com)
1.'A' works twice as fast as 'B'. If both of them together take 6 days to complete the... (answered by josmiceli,vvnrichards)
A can do 1/3 of a work in 5 days and B can do 2/5 of the work in 10 days. In how many... (answered by Edwin McCravy)
A and B together can finish a job in 36 days. If A can do as much work in 4 days as B... (answered by Edwin McCravy)
A can do 1/3 of a work in 5 days and B can do 2/5 of the work in 10 days. How many days... (answered by richwmiller)
Pedro can do a piece work in 4 days,while Alan can do a piece of work in 5 days. In how... (answered by Edwin McCravy)
A can do a piece of work in 2/3 as many days as B, and B can do the same work in 4/5 as... (answered by Edwin McCravy)
Jay can do a painting job in 2/3 as many days as Chris can, and Chris can do it in 3/4 as (answered by ankor@dixie-net.com,josgarithmetic,greenestamps,ikleyn)