SOLUTION: A manufacturer company uses an acceptance scheme on items from a production line before they are shipped. The plant is a two-stage one. Boxes of 25 items are readied for shipment,
Algebra ->
Probability-and-statistics
-> SOLUTION: A manufacturer company uses an acceptance scheme on items from a production line before they are shipped. The plant is a two-stage one. Boxes of 25 items are readied for shipment,
Log On
Question 639893: A manufacturer company uses an acceptance scheme on items from a production line before they are shipped. The plant is a two-stage one. Boxes of 25 items are readied for shipment, and a sample of 3 items is tested for defective. If any defectives are found, the entire box is sent back for 100% screening. If no defectives are found, the box is shipped.
a) What is the probability that a box containing 3 defectives will be shipped?
b) What is the probability that a box containing only 1 defective will be sent back for screening? Answer by reviewermath(1029) (Show Source):