Tutors Answer Your Questions about Finance (FREE)
Question 1142158: Look online to find an interest rates for each of the following:
a) Credit Card
What is the rate charged for overdue monthly balances? Clearly state your answer.
b) Car Company (for financing a new car)
Include your sources (links) AND a screencapture of where on the page you found the information.
Click here to see answer by ikleyn(52781)  |
Question 1142160: You have searched online and found banks offering two different interest rates for the same service: Bank A offers 4.5%/a and Bank B offers 4.9%/a. All other terms of the service are the same.
In what situation would you be better off choosing Bank A? Explain
Click here to see answer by Alan3354(69443)  |
Question 1142229: A company will produce 55000 units next year. Variable cost will equal 40% of sales, while fixed cost will total 110,000. At what price must each unit be sold for the company to achieve an EBIT( earning before income tax) of 95000?
The answer should be $6.21.
Please tell me which formula or process to follow!
Thank you in advance
Click here to see answer by josmiceli(19441)  |
Question 1142301: A new LED light bulb uses 10 watts of power. Since
energy
=
power
×
time
energy=power×time
, then the energy used for this light bulb can be found my multiplying the power times the time the bulb is lit. If the bulb is lit for one hour, the energy used will be 10 watt*hours or 10 Wh. If three 10 watt bulbs in one room are kept on for 5 hours, how many watt*hours of energy are used?
Click here to see answer by Alan3354(69443)  |
Question 1142329: a) Describe the limitations of linear programming technique.
b) XYZ Company ltd has two bottling plants, one located at Mombasa and the other at Voi. Each plant produces three drinks, A, B and C. The number of bottles produced per day are as follows:
PLANT AT
Mombassa Voi
(M) (V)
Drink A 1500 1500
Drink B 3000 1000
Drink C 2000 5000
A market survey indicates that during the month of December 2010, there will be a demand of 20000 bottles of A, 40000 bottles of B and 44000 bottles of C. The operating costs per day for plants at Mombassa and Voi are 600 and 400 monetary units respectively. For how many days should each plant be run in the month of December so as to minimize the production cost, while still meeting the market demand?
Click here to see answer by Theo(13342)  |
Question 1142328: a) Describe the following terms as used in network analysis
i. Critical activity
ii. Super critical activity
iii. Float
iv. Sub-critical activity
b) R&D department is planning to bid on a large project for the development of a new communication system for commercial planes. The accompanying table shows the activities, times and sequences required.
Activity Preceding Activity Time in Days
Optimistic Most likely Pessimistic
Time Time Time
A
B
C
D
E
F
G
H
I
J
K -
-
-
A
B
C
D,E
B
H,F
G,I
J 6 6 24
6 12 18
12 12 30
6 6 6
12 30 48
12 30 42
18 30 54
17 29 47
14 28 48
14 28 48
6 6 24
Required:-
a) Draw a network to represent the above data
b) Determine the critical path of the project and the expected project length
c) Calculate the variance and standard deviation of the project
d) Compute the probability of completing the project within a period of 120 days
e) Suppose you want to shorten the completion time as much as possible and have the option of shortening any or all of B, C, D and G each by two days. Which would you shorten? What would be the new critical path?
Click here to see answer by Alan3354(69443)  |
Question 1142328: a) Describe the following terms as used in network analysis
i. Critical activity
ii. Super critical activity
iii. Float
iv. Sub-critical activity
b) R&D department is planning to bid on a large project for the development of a new communication system for commercial planes. The accompanying table shows the activities, times and sequences required.
Activity Preceding Activity Time in Days
Optimistic Most likely Pessimistic
Time Time Time
A
B
C
D
E
F
G
H
I
J
K -
-
-
A
B
C
D,E
B
H,F
G,I
J 6 6 24
6 12 18
12 12 30
6 6 6
12 30 48
12 30 42
18 30 54
17 29 47
14 28 48
14 28 48
6 6 24
Required:-
a) Draw a network to represent the above data
b) Determine the critical path of the project and the expected project length
c) Calculate the variance and standard deviation of the project
d) Compute the probability of completing the project within a period of 120 days
e) Suppose you want to shorten the completion time as much as possible and have the option of shortening any or all of B, C, D and G each by two days. Which would you shorten? What would be the new critical path?
Click here to see answer by ikleyn(52781)  |
Question 1142281: Question three
a) Describe the term simulation
b) Explain the advantages and disadvantages of simulation techniques
c) Meru bakery keeps stock of a popular brand of cake. Daily demand based on past experience is given below:
Daily demand: 0 15 25 35 45 50
Probability: 0.01 0.15 0.20 0.50 0.12 0.02
Consider the following sequence of random numbers:
48 78 09 51 56 77 15 14 68 09
i. Using the sequence, simulate the demand for the next 10 days
ii. Find the stock demand if the owner of the bakery decides to make 35 cakes every day. Also estimate the daily average demand for the cakes on the basis of the simulated data.
Click here to see answer by Alan3354(69443)  |
Question 1142330: a) Highlight the assumptions in a transportation model.
b) Describe the following terms as used in transportation problems
i. Feasible solution
ii. Basic feasible solution
iii. Optimal solution
c) A product is produced by four factories, A, B, C and D. The unit production costs in them are £2, £3,£1 and £5 respectively. Their production capacities are: factory A- 50 units, B-70 units, C- 30 units and D- 50 units. These factories supply the product to four stores whose demands are 25, 35, 105 and 20 units respectively. Unit transport cost in rupees from each factory to each store are given in table 2 below
TABLE 2
Factories
A
B
C
D STORES
1 2 3 4
2 4 6 11
10 8 7 5
13 3 9 12
4 6 8 3
Required:
Determine the extent of deliveries from each of the factories to each of the stores so that the total production and transportation cost is minimum
Click here to see answer by Alan3354(69443)  |
Question 1142330: a) Highlight the assumptions in a transportation model.
b) Describe the following terms as used in transportation problems
i. Feasible solution
ii. Basic feasible solution
iii. Optimal solution
c) A product is produced by four factories, A, B, C and D. The unit production costs in them are £2, £3,£1 and £5 respectively. Their production capacities are: factory A- 50 units, B-70 units, C- 30 units and D- 50 units. These factories supply the product to four stores whose demands are 25, 35, 105 and 20 units respectively. Unit transport cost in rupees from each factory to each store are given in table 2 below
TABLE 2
Factories
A
B
C
D STORES
1 2 3 4
2 4 6 11
10 8 7 5
13 3 9 12
4 6 8 3
Required:
Determine the extent of deliveries from each of the factories to each of the stores so that the total production and transportation cost is minimum
Click here to see answer by ikleyn(52781)  |
Question 1142326: Question One
a) Explain the purpose of in-put output analysis in an economy.
b) Discuss the assumptions of linear programming.
c) Solve the following using matrix algebra
d) Describe the term game theory and describe at least three types of games.
e) Differentiate the following equation
f) Solve the following game
TABLE 1
PLAYER B
B1 B2
30 2
4 14
6 9
A1
PLAYER A A2
A3
g) A company estimates that the demand for its product fluctuates with the price it charges. The demand function is
Where q equals the number of units demanded and p equals the price in dollars. The total cost of producing q units of the product is estimated by the function
i. Determine how many units q should be produced in order to maximize the annual profit
ii. What price should be charged
iii. Determine The annual profit expected
Click here to see answer by Alan3354(69443)  |
Question 1142326: Question One
a) Explain the purpose of in-put output analysis in an economy.
b) Discuss the assumptions of linear programming.
c) Solve the following using matrix algebra
d) Describe the term game theory and describe at least three types of games.
e) Differentiate the following equation
f) Solve the following game
TABLE 1
PLAYER B
B1 B2
30 2
4 14
6 9
A1
PLAYER A A2
A3
g) A company estimates that the demand for its product fluctuates with the price it charges. The demand function is
Where q equals the number of units demanded and p equals the price in dollars. The total cost of producing q units of the product is estimated by the function
i. Determine how many units q should be produced in order to maximize the annual profit
ii. What price should be charged
iii. Determine The annual profit expected
Click here to see answer by ikleyn(52781)  |
Question 1142398: Golf balls are stacked 3 high in a rectangular prism package. [6 marks]
The diameter of each golf ball is 2.6 cm.
a) What is the minimum amount of material needed to make the box?
Round to the nearest tenth of a centimetre
b) What is the volume of the rectangular prism package?
Round to the nearest tenth of a centimetre
c) What is the volume of each golf ball? Round to the nearest tenth of a centimetre
Click here to see answer by Alan3354(69443)  |
Question 1142399: A tree is struck by lightning during a storm and breaks. If the top of the tree rests on the ground 4 metres from the foot of the tree, find the original height of the tree if the length of the fallen portion is 4.4 metres. Round your answer to the nearest tenth of a metre
Click here to see answer by josgarithmetic(39617) |
Question 1142541: Mary and Eve have the same number of roses. After Eve gave her mother 4/5 of her roses and Mary gave her friends 3/4 of her roses, then the number of roses Mary had left was 3 more than the number of roses Eve had left.
How many roses did Eve have at first?
Can someone help with this question?
Thanks in advance
Click here to see answer by ankor@dixie-net.com(22740)  |
Question 1142675: A barber pole consists of a cylinder of radius 10cm on which one is red, one white, and one blue helix, each of width are painted. The cylinder is 1m high. If each stripe makes a constant angle of 60 degrees with the vertical axis of the cylinder, how much surface area is covered by the red stripe?
Click here to see answer by ikleyn(52781)  |
Question 1142564: b) R&D department is planning to bid on a large project for the development of a new communication system for commercial planes. The accompanying table shows the activities, times and sequences required.
Activity Preceding Activity Time in Days
Optimistic Most likely Pessimistic
Time Time Time
A
B
C
D
E
F
G
H
I
J
K -
-
-
A
B
C
D,E
B
H,F
G,I
J 6 6 24
6 12 18
12 12 30
6 6 6
12 30 48
12 30 42
18 30 54
17 29 47
14 28 48
14 28 48
6 6 24
Required:-
a) Draw a network to represent the above data
b) Determine the critical path of the project and the expected project length
c) Calculate the variance and standard deviation of the project
d) Compute the probability of completing the project within a period of 120 days
e) Suppose you want to shorten the completion time as much as possible and have the option of shortening any or all of B, C, D and G each by two days. Which would you shorten? What would be the new critical path?
Click here to see answer by greenestamps(13200)  |
Question 1142601: The Q and P funds achieved the following results:
Data
Fund Q---Yield 11% ---Standard dev 14% ---Beta 1.1 ---Alfa 0.6% ---Residual standard dev 5%
Fund P---Yield 13%---Standard dev 17%---Beta 1.3---Alfa 2%---Residual standard dev 8%
Also knowing that:
- market yield was 10%
- Risk-free activity yield was 3%
1) Calculate the Sharpe and Treynor indices, and the appraisal ratio
2) Indicate which fund would be the best candidate to associate with a portfolio currently invested in the market index and why
Click here to see answer by greenestamps(13200)  |
Question 1142803:
In a class of 40 students, 23 studying japanese,18 studying korean, 10 both studying japanese and korean. How many students are not taking any foreign languages? How many students are studying japanese only? How many students are studying korean only?
Click here to see answer by greenestamps(13200)  |
Question 1142807: Calculus Question
Determine the volume of the sphere with radius 5 using the technique of cylindrical shells. Remember to include the units. No credit will be given for relying only on the geometric formula. You must use the appropriate technique
Note: The sphere is a semi-circle with points (-5,0) (5,0) and (5,0)
Because I don't know how to add a graph here.
Click here to see answer by solver91311(24713)  |
|
Older solutions: 1..45, 46..90, 91..135, 136..180, 181..225, 226..270, 271..315, 316..360, 361..405, 406..450, 451..495, 496..540, 541..585, 586..630, 631..675, 676..720, 721..765, 766..810, 811..855, 856..900, 901..945, 946..990, 991..1035, 1036..1080, 1081..1125, 1126..1170, 1171..1215, 1216..1260, 1261..1305, 1306..1350, 1351..1395, 1396..1440, 1441..1485, 1486..1530, 1531..1575, 1576..1620, 1621..1665, 1666..1710, 1711..1755, 1756..1800, 1801..1845, 1846..1890, 1891..1935, 1936..1980, 1981..2025, 2026..2070, 2071..2115, 2116..2160, 2161..2205, 2206..2250, 2251..2295, 2296..2340, 2341..2385, 2386..2430, 2431..2475, 2476..2520, 2521..2565, 2566..2610, 2611..2655, 2656..2700, 2701..2745, 2746..2790, 2791..2835, 2836..2880, 2881..2925, 2926..2970, 2971..3015, 3016..3060, 3061..3105, 3106..3150, 3151..3195, 3196..3240, 3241..3285, 3286..3330, 3331..3375, 3376..3420, 3421..3465, 3466..3510, 3511..3555, 3556..3600, 3601..3645, 3646..3690, 3691..3735, 3736..3780, 3781..3825, 3826..3870, 3871..3915, 3916..3960, 3961..4005, 4006..4050, 4051..4095, 4096..4140, 4141..4185, 4186..4230, 4231..4275, 4276..4320, 4321..4365, 4366..4410, 4411..4455, 4456..4500, 4501..4545, 4546..4590, 4591..4635, 4636..4680, 4681..4725, 4726..4770, 4771..4815, 4816..4860, 4861..4905, 4906..4950, 4951..4995, 4996..5040, 5041..5085, 5086..5130, 5131..5175, 5176..5220, 5221..5265, 5266..5310, 5311..5355, 5356..5400, 5401..5445, 5446..5490, 5491..5535, 5536..5580, 5581..5625, 5626..5670, 5671..5715, 5716..5760, 5761..5805, 5806..5850, 5851..5895, 5896..5940, 5941..5985, 5986..6030, 6031..6075, 6076..6120, 6121..6165, 6166..6210, 6211..6255, 6256..6300, 6301..6345, 6346..6390, 6391..6435, 6436..6480, 6481..6525, 6526..6570, 6571..6615, 6616..6660, 6661..6705, 6706..6750, 6751..6795, 6796..6840, 6841..6885, 6886..6930, 6931..6975, 6976..7020, 7021..7065, 7066..7110, 7111..7155, 7156..7200, 7201..7245, 7246..7290, 7291..7335, 7336..7380, 7381..7425, 7426..7470, 7471..7515, 7516..7560, 7561..7605, 7606..7650, 7651..7695, 7696..7740, 7741..7785, 7786..7830, 7831..7875, 7876..7920, 7921..7965, 7966..8010, 8011..8055, 8056..8100, 8101..8145, 8146..8190, 8191..8235, 8236..8280, 8281..8325, 8326..8370, 8371..8415, 8416..8460, 8461..8505, 8506..8550, 8551..8595, 8596..8640, 8641..8685, 8686..8730, 8731..8775, 8776..8820, 8821..8865, 8866..8910, 8911..8955, 8956..9000, 9001..9045, 9046..9090, 9091..9135, 9136..9180, 9181..9225, 9226..9270, 9271..9315, 9316..9360, 9361..9405, 9406..9450, 9451..9495, 9496..9540, 9541..9585, 9586..9630, 9631..9675, 9676..9720, 9721..9765, 9766..9810, 9811..9855, 9856..9900, 9901..9945, 9946..9990, 9991..10035, 10036..10080, 10081..10125, 10126..10170, 10171..10215, 10216..10260, 10261..10305, 10306..10350, 10351..10395, 10396..10440, 10441..10485, 10486..10530, 10531..10575, 10576..10620, 10621..10665, 10666..10710, 10711..10755, 10756..10800, 10801..10845, 10846..10890, 10891..10935, 10936..10980, 10981..11025, 11026..11070, 11071..11115, 11116..11160, 11161..11205, 11206..11250, 11251..11295, 11296..11340, 11341..11385, 11386..11430, 11431..11475, 11476..11520, 11521..11565, 11566..11610, 11611..11655, 11656..11700, 11701..11745, 11746..11790, 11791..11835, 11836..11880, 11881..11925, 11926..11970, 11971..12015, 12016..12060, 12061..12105, 12106..12150, 12151..12195, 12196..12240, 12241..12285, 12286..12330, 12331..12375, 12376..12420, 12421..12465, 12466..12510, 12511..12555, 12556..12600, 12601..12645, 12646..12690, 12691..12735, 12736..12780, 12781..12825, 12826..12870, 12871..12915, 12916..12960, 12961..13005, 13006..13050, 13051..13095, 13096..13140, 13141..13185, 13186..13230, 13231..13275, 13276..13320, 13321..13365, 13366..13410, 13411..13455, 13456..13500, 13501..13545, 13546..13590, 13591..13635, 13636..13680, 13681..13725, 13726..13770, 13771..13815, 13816..13860, 13861..13905, 13906..13950, 13951..13995, 13996..14040, 14041..14085, 14086..14130, 14131..14175, 14176..14220, 14221..14265, 14266..14310, 14311..14355, 14356..14400, 14401..14445, 14446..14490, 14491..14535, 14536..14580, 14581..14625, 14626..14670, 14671..14715, 14716..14760, 14761..14805, 14806..14850, 14851..14895, 14896..14940, 14941..14985, 14986..15030, 15031..15075, 15076..15120, 15121..15165, 15166..15210, 15211..15255, 15256..15300, 15301..15345, 15346..15390, 15391..15435, 15436..15480, 15481..15525, 15526..15570, 15571..15615, 15616..15660, 15661..15705, 15706..15750, 15751..15795, 15796..15840, 15841..15885, 15886..15930, 15931..15975, 15976..16020, 16021..16065, 16066..16110, 16111..16155, 16156..16200, 16201..16245, 16246..16290, 16291..16335, 16336..16380, 16381..16425, 16426..16470, 16471..16515, 16516..16560
|