SOLUTION: A building needed 14 windows. The builder had already installed 5 of them. If it takes four hours to install each window. How long will it take him to install the rest? I have tr
Algebra ->
Conjunction
-> SOLUTION: A building needed 14 windows. The builder had already installed 5 of them. If it takes four hours to install each window. How long will it take him to install the rest? I have tr
Log On
Question 1060543: A building needed 14 windows. The builder had already installed 5 of them. If it takes four hours to install each window. How long will it take him to install the rest? I have tried subtracting 14 and 5 and then multiplying 9 and 4 and getting 36, but i am no sure if it is right.
You can put this solution on YOUR website!
A building needed 14 windows. The builder had already installed 5 of them. If it takes four hours to install each window. How long will it take him to install the rest? I have tried subtracting 14 and 5 and then multiplying 9 and 4 and getting 36, but i am no sure if it is right.
You're right! Good job!
By the way, it should be: I have tried subtracting 14 5 and from 5 14......