SOLUTION: 6 people worked for 9 days to complete two fifths of a project. If three joined the original 6 people, how many days were needed to complete the project?

Algebra ->  Rate-of-work-word-problems -> SOLUTION: 6 people worked for 9 days to complete two fifths of a project. If three joined the original 6 people, how many days were needed to complete the project?      Log On


   



Question 726648: 6 people worked for 9 days to complete two fifths of a project. If three joined the original 6 people, how many days were needed to complete the project?
Answer by Edwin McCravy(20077) About Me  (Show Source):
You can put this solution on YOUR website!
6 people worked for 9 days to complete two fifths of a project. If three
joined the original 6 people, how many days were needed to complete the project?

You can do it in your head.  I'll show you that way and then I'll show you
how to do it by algebra:

IN YOUR HEAD.
When the 3 joined them, there were one and a half times as many people,
but the remaining 3%2F5ths of the job is one and a half times the 2%2F5ths they had
already completed, so it would take them the same time, or 9 days.

BY ALGEBRA:
Let x = the number of days needed to complete the remaining 3%2F5 of the project.

The 6 people's combined rate is 2%2F5ths of project per 9 days or %222%2F5_project%22%2F%229_days%22 or 

%282%2F5%29%2F9%28project%29%2F%28day%29 or %282%2F5%29%2A%281%2F9%29 or 2%2F45%28project%29%2F%28day%29

Since 3 people is half of 6 people, the three who joined them's combined rate
is half that or 1%2F45%28project%29%2F%28day%29, since half as many people work at only half the rate 
of 6 people.

Therefore the combined rate of all 9 people is 2%2F45%22%22%2B%22%221%2F45 or 3%2F45 or 1%2F15%28project%29%2F%28day%29

After the three joined them after 2%2F5ths of the project was completed, there was 
only 3%2F5ths of the project left to do, so we set up this proportion:

1 project is to 15 days as 3%2F5ths of a project is to x days.

          1%2F15%22%22=%22%22%283%2F5%29%2Fx

Cross multiply:

          x = 3%2F5·15
          x = 9

So 9 more days were needed to complete the project.

Edwin