Question 565902
in 2 min a belt moves 300 lbs. a smaller belt moves the same amount the same distance in 6 mins. if both belts r used how long will it take to move the cans?
----
1st belt rate: 1/2 job/min
2nd belt rate: 1/6 job/min
---
Together rate: 1/x job/min
=================================
Equation:
rate + rate = together rate
1/2 + 1/6 = 1/x
3x + x = 6
4x = 6
x = 1.5 min (time for the two belts together to move 300 lbs.)
==============
Cheers,
Stan H.