document.write( "Question 920224: Pipe A can fill a tank in 4 hours and pipe B can fill the tank in 1/2 the time required for pipe C to empty the tank. When all three pipes are open the tank is filled in 2.4 hours. How long for C to drain the tank? \r
\n" );
document.write( "\n" );
document.write( "I tried setting up a table. But I'm not sure what the significance of whether the tank is being filled or emptied is.
\n" );
document.write( "Thank you for helping.
\n" );
document.write( " \n" );
document.write( "
Algebra.Com's Answer #558248 by josmiceli(19441)![]() ![]() You can put this solution on YOUR website! Rates of FILLING are (+) \n" ); document.write( "Rates of emptying are (-) \n" ); document.write( "----------------------- \n" ); document.write( "Rate of filling for pipe A: \n" ); document.write( "( 1 tank ) / ( 4 hrs ) \n" ); document.write( "------------------------ \n" ); document.write( "Let \n" ); document.write( " \n" ); document.write( "( 1/2 the time means twice the rate ) \n" ); document.write( "------------------------------------ \n" ); document.write( "Add the rates with all 3 pipes open: \n" ); document.write( " \n" ); document.write( "Multiply both sides by \n" ); document.write( " \n" ); document.write( " \n" ); document.write( " \n" ); document.write( "--------------- \n" ); document.write( " \n" ); document.write( "In minutes: \n" ); document.write( " \n" ); document.write( " \n" ); document.write( "Pipe C drains the tank in 10 min \n" ); document.write( "------------------------------ \n" ); document.write( "check: \n" ); document.write( " \n" ); document.write( " \n" ); document.write( "Multiply both sides by \n" ); document.write( " \n" ); document.write( " \n" ); document.write( "OK \n" ); document.write( " |