document.write( "Question 581680: Joe need 3 days to tile a rectangular pool of even depth. How long will it take him working at the same rate to tile a pool twice as long,twice as wide and twice as deep. \n" ); document.write( "
Algebra.Com's Answer #371779 by stanbon(75887)\"\" \"About 
You can put this solution on YOUR website!
Joe need 3 days to tile a rectangular pool of even depth. How long will it take him working at the same rate to tile a pool twice as long,twice as wide and twice as deep.
\n" ); document.write( "----
\n" ); document.write( "Let original surface area be LW + 2WH + 2LH
\n" ); document.write( "----
\n" ); document.write( "New surface area will be (2L)(2W) + 2(2W)(2H) + 2(2L)(2H)
\n" ); document.write( "= 4LW + 8WH + 8LH = 4[LW + 2WH + 2LH)
\n" ); document.write( "----
\n" ); document.write( "Original time to tile = 3 days
\n" ); document.write( "New time to tile = 4*3 = 12 days.
\n" ); document.write( "=====================================
\n" ); document.write( "cheers,
\n" ); document.write( "Stan H.
\n" ); document.write( "
\n" );